<?xml version="1.0" encoding="UTF-8"?>        <rss version="2.0"
             xmlns:atom="http://www.w3.org/2005/Atom"
             xmlns:dc="http://purl.org/dc/elements/1.1/"
             xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
             xmlns:admin="http://webns.net/mvcb/"
             xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
             xmlns:content="http://purl.org/rss/1.0/modules/content/">
        <channel>
            <title>
									12kPV - EG4 Community Forum				            </title>
            <link>https://forum.eg4electronics.com/community/12kpv/</link>
            <description>EG4 Community Forum Discussion Board</description>
            <language>en-US</language>
            <lastBuildDate>Sat, 18 Apr 2026 20:02:00 +0000</lastBuildDate>
            <generator>wpForo</generator>
            <ttl>60</ttl>
							                    <item>
                        <title>EG4_FAAB-2727 (Most Recent Firmware)</title>
                        <link>https://forum.eg4electronics.com/community/12kpv/eg4_faab-2727-newest-firmware-2/</link>
                        <pubDate>Mon, 06 Apr 2026 21:46:08 +0000</pubDate>
                        <description><![CDATA[EG4_FAAB-2727
2026-03-29

Based on FAAB-2626/2525.
Match LCD V25.
1. Improved. New England Grid Profile — added regional grid profile support for New England configurations, with Voltag...]]></description>
                        <content:encoded><![CDATA[<h3 data-v-2d096cc4="">EG4_FAAB-2727</h3>
<h5 class="title" data-v-2d096cc4="">2026-03-29</h5>
<ul class="list" data-v-2d096cc4="">
<li data-v-2d096cc4=""><span data-v-2d096cc4="">Based on FAAB-2626/2525.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">Match LCD V25.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">1. Improved. New England Grid Profile — added regional grid profile support for New England configurations, with Voltage-Active mode disabled by default.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">2. Improved. Added RS485 BUS communication support on the Meter485 port for PPL Electric installations.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">3. Improved. LUMA Grid Profile: Voltage-Active Power mode enabled by default.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">4. Improved. HECO Grid Profile: Frequency-Active Power mode enabled by default; under-excited reactive power set as default.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">5. Improved. Optimized charging power limitations when PV power is unbalanced across inverters in a parallel system.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">6. Improved. LCD phase setting labels updated from R/S/T to A/B, B/C, C/A （LCD V25）.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">7. Improved. Update fan logic to start fans at a lower temperature to optimize heat dissipation.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">8. Bug Fixes. Fixed repeated switching between on-grid and off-grid modes on the secondary inverter triggered by off-grid cut-off voltage in parallel shared-battery and lead-acid battery mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">9. Bug Fixes. Reduced probability of repeated state switching between PVBatGridOn and PVChgGridOn.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">10. Bug Fixes. Fixed the inability to exit on-grid AC couple charging state and switch to battery discharge when load exceeds AC couple power in a parallel system.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/12kpv/">12kPV</category>                        <dc:creator>EG4 Eric</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/12kpv/eg4_faab-2727-newest-firmware-2/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-2122 / 06-22-2025</title>
                        <link>https://forum.eg4electronics.com/community/12kpv/eg4_faab-2122-06-22-2025-4/</link>
                        <pubDate>Wed, 14 Jan 2026 15:48:30 +0000</pubDate>
                        <description><![CDATA[EG4_FAAB-2122
2025-06-22

Based on FAAB-2021
1.Add Weekly Setting function.
2.Add the function of Sporadic AC charge power function, it will cause the AC charge power to fluctuate rando...]]></description>
                        <content:encoded><![CDATA[<h3 data-v-2d096cc4="">EG4_FAAB-2122</h3>
<h5 class="title" data-v-2d096cc4="">2025-06-22</h5>
<ul class="list" data-v-2d096cc4="">
<li data-v-2d096cc4=""><span data-v-2d096cc4="">Based on FAAB-2021</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">1.Add Weekly Setting function.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">2.Add the function of Sporadic AC charge power function, it will cause the AC charge power to fluctuate randomly between the set AC charging power and 2% rated power.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">3.Optimize the response speed and stability in zero export mode in meter mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">4.Optimize the restart logic that modify the CT/meter, battery type and brand will not be restarted.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">5.Improve the issue of reading the RGM settings.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">6.Improve the issue of power display on Micro-Grid mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">7.Improve the issue of not stopping at the Stop Discharge Volt of forced discharge.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">8.Improve the issue where the LCD display on the load power side lacked Smart Load power when the Micro Grid plus Smart Load mode were enabled.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">9.Improve the issue of increased charge power when setting the Charge Last mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">10.Improve the issue of abnormal load display in web page flow chart during parallel mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">11.Improve the issue of getting phase lost warning when switching from on-grid and off-grid in three phase parallel mode.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/12kpv/">12kPV</category>                        <dc:creator>EG4 Eric</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/12kpv/eg4_faab-2122-06-22-2025-4/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-2525</title>
                        <link>https://forum.eg4electronics.com/community/12kpv/eg4_faab-2525-3/</link>
                        <pubDate>Fri, 12 Dec 2025 17:35:02 +0000</pubDate>
                        <description><![CDATA[EG4_FAAB-2525
2025-09-28
Firmware Changelog – FAAB-2525 （Based on FAAB-2122）1.Added support for BASCO battery protocol （Battery Brand Setting 22）.2.Added support for SunSpec Modbus IEEE-15...]]></description>
                        <content:encoded><![CDATA[<h3 data-v-2d096cc4="">EG4_FAAB-2525</h3>
<h5 class="title" data-v-2d096cc4="">2025-09-28</h5>
<p><span data-v-2d096cc4=""><strong>Firmware Changelog – FAAB-2525</strong> （Based on FAAB-2122）</span><br /><span data-v-2d096cc4="">1.Added support for BASCO battery protocol （Battery Brand Setting 22）.</span><br /><span data-v-2d096cc4="">2.Added support for SunSpec Modbus IEEE-1547 certification.</span><br /><span data-v-2d096cc4="">3.Added support for N-PE bonding setting – enables closing the N-PE relay only in off-grid mode.</span><br /><span data-v-2d096cc4="">4.Added support for displaying EG4 battery model information.</span><br /><span data-v-2d096cc4="">5.Improved download time for subsequent firmware updates.</span><br /><span data-v-2d096cc4="">6.Enhanced encryption for firmware update packages.</span><br /><span data-v-2d096cc4="">7.Improved stability of remote LCD firmware updates.</span><br /><span data-v-2d096cc4="">8.Added ability to configure generator exercise cycles even when grid power is available （keeps generator in idle operation）.</span><br /><span data-v-2d096cc4="">9.Improved MPPT behavior.</span><br /><span data-v-2d096cc4="">10.Adjusted the Absorb Voltage and Float Voltage lower limit from 50 V → 48 V.</span><br /><span data-v-2d096cc4="">11.Expanded the setting range of Stop AC Charge SOC （%） to 0–101%.</span><br /><span data-v-2d096cc4="">12.Expanded the configurable range of grid protection parameters for 127/220 V grid type.</span><br /><span data-v-2d096cc4="">13.Fixed issue where LCD communication fault could occur when the FlexBOSS LCD screen kit backlight was off.</span><br /><span data-v-2d096cc4="">14.Improved LCD display for PV input arrow:</span><br /><span data-v-2d096cc4="">- Single unit: arrow displays when PV power &gt;100 W</span><br /><span data-v-2d096cc4="">- Parallel system: arrow displays when total PV power &gt;300 W</span><br /><span data-v-2d096cc4="">15.Fixed issue where consumption power was not displayed on monitoring line chart during off-grid or parallel operation.</span><br /><span data-v-2d096cc4="">16.Improved stability when switching between on-grid and off-grid modes if the battery discharges to the On-Grid Cut-Off SOC/Voltage while running with GridBOSS and set to Off-Grid mode.</span><br /><span data-v-2d096cc4="">17.Improved SOC control mode:</span><br /><span data-v-2d096cc4="">- If battery voltage drops below the off-grid cut-off voltage, the inverter will force charge the battery up to （cut-off voltage + 2 V）.</span><br /><span data-v-2d096cc4="">- Prevents over-discharge in cases where BMS SOC reporting is inaccurate.</span><br /><span data-v-2d096cc4="">18.When inverter is set to lead-acid battery mode or no battery mode, the active W04: Battery BMS Status Alarm will now be cleared automatically.</span></p>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/12kpv/">12kPV</category>                        <dc:creator>EG4 Eric</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/12kpv/eg4_faab-2525-3/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-2021</title>
                        <link>https://forum.eg4electronics.com/community/12kpv/eg4_faab-2021-2/</link>
                        <pubDate>Wed, 12 Mar 2025 20:09:28 +0000</pubDate>
                        <description><![CDATA[Same as fAAB-2021, change based on FAAB-1E1E.

1. Add the new startup option &quot;Soc/Volt + Time&quot; for AC charge startup. （Compatible with LCD V20）.
2. Add two-time settings to the generator ...]]></description>
                        <content:encoded><![CDATA[<p><span data-v-8ce5ee12="">Same as fAAB-2021, change based on FAAB-1E1E.</span></p>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Add the new startup option "Soc/Volt + Time" for AC charge startup. （Compatible with LCD V20）.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Add two-time settings to the generator startup setting.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. Add AC couple on EPS port function to Flex Boss that paralleled with Grid Boss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4. Optimize when either ‘charge control’ or ‘discharge control’ setting changes, the settings for both will be updated synchronously.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">* synchronized Charge and Discharge. if a customer sets the charging control to SOC, the discharging control setting will automatically switch to SOC.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5. Changing the CT ratio on monitor site no longer requires a system restart.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6. Optimize the issues of flicker.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7. Optimize the standard voltage of BUS1 to 370V.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8. Optimize the communication fault logic when connecting to Grid Boss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">*it has been modified to alert when disconnecting the communication line when on-grid or off-grid</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9. Optimize the issue of switching and EPS output interruption when PV is weak</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10. Optimize DCDC operation to make it more stable.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11. Fix the parallel phase error issue when connecting generator in split phase parallel system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">LCD V20</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Add the new startup option "Soc/Volt + Time" for AC charge startup.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/12kpv/">12kPV</category>                        <dc:creator>Jared</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/12kpv/eg4_faab-2021-2/</guid>
                    </item>
				                    <item>
                        <title>EG4_EAAB-1E1E</title>
                        <link>https://forum.eg4electronics.com/community/12kpv/eg4_eaab-1e1e/</link>
                        <pubDate>Thu, 14 Nov 2024 15:04:35 +0000</pubDate>
                        <description><![CDATA[2024-11-13

Same as eAAB-1E1E, changes based on the EAAB-1B1C and EAAB-1D1D. After updating, it cannot restore version of FAAB-1C1C and below.
1.Compatible with FlexBoss.
2.Support worki...]]></description>
                        <content:encoded><![CDATA[<h5 class="title" data-v-8ce5ee12="">2024-11-13</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Same as eAAB-1E1E, changes based on the EAAB-1B1C and EAAB-1D1D. After updating, it cannot restore version of FAAB-1C1C and below.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1.Compatible with FlexBoss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2.Support working with GridBoss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3.Add Dark Start logic to disconnect the EPS load</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">by using the dry contact 2 to control external relay or contactor</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12=""> when the battery SOC/Volt is very low and there is no grid available and allows the connected grid-tied inverter or generator to prioritize charging the battery to dart start the system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4.Add WattNode RGM protocol, CT ratio and direction setting.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5.Add Dry contact reuse function for configuring RSD, Smart load, Darkstart and Non-critical Load.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6.Optimize the ability to take the half wave load.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7.Optimize remote update process.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8.Optimize the protection of model settings.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9.Optimize the update process without power loss for the single, parallel, GridBoss parallel system. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10.Optimize the charge and discharge current setting limit for parallel system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11.Optimize the BUS1 issue when the battery voltage goes to 40V. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">12.Optimize the operation of non-shared battery mode for GridBoss parallel system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">13.Optimize generator dry contact logic in parallel system. The master unit summarizes the status of each dry contact. If any dry contact meets the ON conditions, the system is set to work. If all unit meet the OFF conditions, the system will be set to stop. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">14.Optimize the Lithium battery option 31 not being able to be set for 16 cell lithium battery without communication. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">15.Optimize the issue that AC charge power cannot be reduced to 0 when the load exceeds the set generator rating power in parallel system with generator. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">16.Optimize the frequency shift when AC couple power exceeding system requirements in single unit with GridBoss system. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">17.Optimize the logic of Grid Always On function in smart load setting that,</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">keep the smart load working even if enable Off-Grid Mode as long as the grid exists.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">18.Optimize the LCD power flow display of the parallel system to display the total system power and change the display of power unit from W to kW.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">19.Optimize display of PV3 power on LCD. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">20.Optimize the display of three-phase load power in parallel system.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/12kpv/">12kPV</category>                        <dc:creator>Jared</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/12kpv/eg4_eaab-1e1e/</guid>
                    </item>
				                    <item>
                        <title>EG4_EAAB-1B1C</title>
                        <link>https://forum.eg4electronics.com/community/12kpv/eg4_eaab-1b1c/</link>
                        <pubDate>Fri, 11 Oct 2024 19:10:46 +0000</pubDate>
                        <description><![CDATA[2024-06-21

Change based on the FAAB-1A1A.
1.Fixed an issue when inverter in off-grid mode, inverter can&#039;t use generator to take load and charge battery.
2. Optimized the logic of on-gri...]]></description>
                        <content:encoded><![CDATA[<h5 class="title" data-v-8ce5ee12="">2024-06-21</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Change based on the FAAB-1A1A.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1.Fixed an issue when inverter in off-grid mode, inverter can't use generator to take load and charge battery.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Optimized the logic of on-grid load taking.</span></li>
</ul>
<div class="wpf-post-button-actions"> </div>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/12kpv/">12kPV</category>                        <dc:creator>Jared</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/12kpv/eg4_eaab-1b1c/</guid>
                    </item>
				                    <item>
                        <title>Previous Changes</title>
                        <link>https://forum.eg4electronics.com/community/12kpv/previous-changes-3/</link>
                        <pubDate>Fri, 11 Oct 2024 19:09:40 +0000</pubDate>
                        <description><![CDATA[EG4_EAAB-1A1A
2024-04-22

Same as fAAB-1A1A, changes based on the FAAB-1919.
1.Add 2 minutes of Warmup to the generator microgrid mode.
2. Add split phase voltage overvoltage and underv...]]></description>
                        <content:encoded><![CDATA[<div id="1" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-1A1A</h3>
<h5 class="title" data-v-8ce5ee12="">2024-04-22</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Same as fAAB-1A1A, changes based on the FAAB-1919.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1.Add 2 minutes of Warmup to the generator microgrid mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Add split phase voltage overvoltage and undervoltage protection for US models.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. Improvement, keep off-grid state when countdown to connect to on-grid mode. At the end of the countdown, it will quickly switch from off grid to on-grid mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4. Improve load calculation in three-phase parallel and on-grid mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5. Fix the issue of using Grid AC to charge even when SOC/Volt reaches Stop AC Charge SOC/Volt when AC Couple and AC Charge are enabled.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6. Optimize AC Couple power display.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7. Fix the issue of the original AC Couple power not being able to reset to zero when the AC Couple is disconnected from the grid and there is no grid power.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8. Update PR-LUMA grid regulations parameters.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9. Update register information for "Permit Service".</span></li>
</ul>
</div>
<div id="2" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-1919</h3>
<h5 class="title" data-v-8ce5ee12="">2024-03-18</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes based on the FAAB-1818</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1.Corrected the sampling of NPE connection.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Logic optimization: When the battery SOC/Voltage is lower than "Start generator charge SOC/VOLT" limit, the dry contact turns on, and only when there is generator input, the inverter enters generator charge mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. Optimized the control logic for the following scenario: When the PV power is sufficient, but grid sell back is not allowed and there is no load compensation requirement, once battery is fully charged, BUS over voltage issue happens.</span></li>
</ul>
</div>
<div id="3" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-1818</h3>
<h5 class="title" data-v-8ce5ee12="">2024-02-26</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">（Same as fAAB-1818）based on FAAB-1616 and FAAB-1717</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1.New feature— Parallel Setting Data Sync, synchronize the settings of primary and subordinate inverters.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2.New feature— Gen Boost, which enables the PV and battery to work with the generator together when the generator power is insufficient to handle the load.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3.New feature— Battery Backup Mode. When enabled, the batteries will stay at the appointed SOC （default 100% SOC） unless there is no grid or grid abnormality or no generator port input.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4.New feature—N PE relay control</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5.New feature—Gen overload alarm, if the generator power is greater than GenRatedPower+500w for 1 minute, an alarm prompt will appear.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6.Newly added—127/220V Grid Type. When set Grid Type to 120/208V, set EPS Voltage to 220V, the grid protection rules can be automatically adapted.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7.Newly added—Grid Peak-Shaving Power 2 kW, effective for corresponding time period 2.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8.Newly added—EPS overload recovery time is upload.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9.Newly added—Generator Cool-Down Time （Min） setting. After the generator is charged to the cut-off voltage, the inverter will not switch back to the generator for power supply unless it has not been shut down before exceeding the cooldown set time.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10.Improvment—Optimization of generator related logic. When manually starting the generator, as long as the GeneratorChargeEndSOC/Volt setting is not reached, it can still be charged. After stopping charging at GeneratorChargeEndSOC/Volt, there is a delay of 5 minutes for allowing to recharge to prevent repeated switching.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11. Improvement—Optimization of Quick charge. The inverter will automatically change its settings and use the AC charge function for the next one hour. After the charge is completed, the settings will be restored.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">12. Improvement—The range of AC Couple Start/End Volt/SOC are enlarged.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">13. Improvement—AC Couple can be used normally, when Micro grid enabled but generator is off.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">14. Improvement—Adjust the range of lead-acid battery Ah settings from 50Ah to 5000Ah.The triggering current entering float charge mode can be changed （defaults to 0.01C）.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">15. Improvement—Surge protection supports EPS output by1.35 times rated power for 1 minute.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">16. Improvement—Balanced load during parallel and on-grid mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">17. Change—The Share Battery function in the US version is enabled by default.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">18. Problem fixing—Fixing the issue of generator cannot be able to shut down after being started up by Quick Gen start. Generator will be automatically shuts down after 20 minutes of startup.</span></li>
</ul>
</div>
<div id="4" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-1717</h3>
<h5 class="title" data-v-8ce5ee12="">2024-01-18</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-1717）based on FAAB-1616</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. New feature: On-grid load balance and PV Sell for parallel system</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. New feature: Parallel settings synchronization</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. Flicker optimization: Voltage drop when heavy load start</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4. Optimization for generator application, such as transfer time, warm up, cool down, exercise, and quick start&amp;stop remotely.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5. Issue fixed: Generator End volt/SOC setting not work</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6. Bug fixed: Cannot exit EPS mode when RSD active</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7. Raise default value of start&amp;stop volt/SOC for AC Couple, if PV inverter does not derate power at over frequency, customer can set lower value to disconnect it by generator relay</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8. Enable Share Battery Function by default for US version</span></li>
</ul>
</div>
<div id="5" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-1616</h3>
<h5 class="title" data-v-8ce5ee12="">2023-10-20</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-1616）based on FAAB-1312.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Optimization on frequency shifting for AC couple function has been done.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Optimization on Zero export function: Stop frequently switching between PV charge +Grid on and PV+Battery grid on modes.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. 3phase （208Vac/120Vac）parallel solution has been supported: 2 *208V 3phase parallel and 3 *208V 3phase parallel are supported.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4. Optimization on EPS transfer time has been done.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5. RSD active signal to BMS has been added: Battery needs to support the respond to RSD demand too.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6. The setting range of Generator rated power has been changed to 255kW max and 1kW min.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7. Logics optimization: Once "Fast zero export " function is enabled, " Grid sell back " function won't take effect.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8. Refined parameter adjustments for Battery control: On-Grid cut off VOLT form（40-52V）to（40-56V）; AC Charge Start Volt from（38.5V-52V）to（40-57V）; AC Charge End Volt from（48V-59V）to（42-59V）; Gen Charge Start Volt from（40V-59V）to（40-57V）；Gen Charge End Volt from（40V-59V）to（42-59V），AC Couple Start Volt from（start-59V）to（42-59V）.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9. New Feature for LCD display: "Connect in xxxs " for the waiting time to on-grid mode will be showed at the top line of the home page.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10. Logics optimization on Generator dry contact control: Warming up the generator for 2 minutes before entering charge mode and cooling down the generator for 2 minutes before cutting it off.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11. Optimization on voltage drop of EPS output while connecting or disconnecting with heavy load has been done.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">12. Logics adjustment: When forced discharge function is enabled, AC coupling power will prioritize to export to grid instead of going to AC charge mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">13. Logics adjustment: When PV energy is weak, to prevent switching PV grid on mode frequently with high frequency relay clicking noise, the time delay to enter another check changes to 2 seconds.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">14. New Feature: System charge end SOC:0-255%, VOLT :40-59V.</span></li>
</ul>
</div>
<div id="6" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-1312</h3>
<h5 class="title" data-v-8ce5ee12="">2023-08-16</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-1312）based on FAAB-1010.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Optimized surge power and addressed voltage drop concerns when operating in EPS mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. "PV sell to grid" function is supported; Note that it's not yet available for parallel systems.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. Refined parameter adjustments for LUMA Grid regulation.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4. With firmware version FAAB-1010, enabling the "run without grid" function won't activate generator dry contact logic.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5. Resolved EPS overload triggers from both total EPS voltage and split-phase voltage.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6. Improved control to prevent " BUS voltage High " issue when operating in AC couple mode.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7. Enabled RSD control synchronization in parallel systems.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8. Implemented "strict zero export "; When PV and battery energy suffice for loads, the inverter won't exchange energy with the utility grid.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9. Modified AC coupling input recognition, treating it as PV input with equivalent priority as integrated PV power.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10. In previous firmware</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">FAAB-1010</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">and with fast zero export active, the inverter won't switch to PV charge mode when battery energy is low.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11. Improved surge capacity: For power levels between Pn and 1.16Pn, 10 minutes; and between 1.16Pn and 1.3*Pn, 5 minutes.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">12.Default settings for Lead Acid mode include a charge voltage of 55V and charge/discharge current limitation of 0.5C.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">13. Enhanced generator quick start functionality.</span></li>
</ul>
</div>
<div id="7" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-1010</h3>
<h5 class="title" data-v-8ce5ee12="">2023-06-30</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-1010/ eAAB-1010/EAAB-1010）based on FAAB-0D0E.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Enlarged the grid sell back power limitation, if power limitation is high than 200%, then real limitation will be 1000% max.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Peak-shaving logic optimization.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. Fortress battery protocol optimization: working in lead-acid mode where is communication failure issue.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4. AC Charge according to SOC or VOLT could be supported in this firmware version.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5. Octopus charge function is supported.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6. To avoid relays clicking on and off frequently due to grid fluctuation， a return value has been added in this firmware version.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7. Hina battery protocol is supported in this firmware version.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8. Grid regulation changes: Hawaii changed to HECO, added KIUC grid regulation.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9. Battery capacity could be showed in the LCD display.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10. Optimization on AC coupling function: AC charge and battery discharge will be seamless switching way.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11. Fans control logic optimization to reduce fans noise</span></li>
</ul>
</div>
<div id="8" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-0D0E</h3>
<h5 class="title" data-v-8ce5ee12="">2023-05-12</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-0D0E/ eAAB-0D0E/EAAB-0D0E）based on FAAB-0C0D</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Fixed the logic issue when PV energy is low, the inverter would fail to switch work mode from PV charge to battery discharge</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Optimized charge logic of AC coupling input and maximize the use of AC coupling charge</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3.Optimized the logic of charge limit in AC charge mode.</span></li>
</ul>
</div>
<div id="9" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-0C0D</h3>
<h5 class="title" data-v-8ce5ee12="">2023-04-13</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-0C0D/ eAAB-0C0D/EAAB-0C0D）based on FAAB-0C0C</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Adjusted Control logic of Aging test in Luxpower factory</span></li>
</ul>
</div>
<div id="10" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-0C0C</h3>
<h5 class="title" data-v-8ce5ee12="">2023-04-03</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-0C0C/ eAAB-0C0C/EAAB-0C0C）based on FAAB-0B0B</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Adjusted Control logic of Aging test in Luxpower factory</span></li>
</ul>
</div>
<div id="11" data-v-8ce5ee12="">
<h3 data-v-8ce5ee12="">EG4_EAAB-0B0B</h3>
<h5 class="title" data-v-8ce5ee12="">2023-03-28</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Changes log （Same as fAAB-0B0B/ eAAB-0B0B/EAAB-0B0B）based on FAAB-0A0A</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1.CT direction could be corrected remotely and individually in 3phase parallel system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2.Non battery shared mode, current limitation will depend on individual battery banks</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3.Fixed discharge configuration in LCD: in previous version, discharge power needs to be configured twice to take effect, and this bug has been fixed in new version.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4.Fixed discharge configuration in LCD: in previous version, discharge power needs to be configured twice to take effect, and this bug has been fixed in new version.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5.Modified Hawaii Grid regulation: QV curve</span></li>
</ul>
</div>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/12kpv/">12kPV</category>                        <dc:creator>Jared</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/12kpv/previous-changes-3/</guid>
                    </item>
							        </channel>
        </rss>
		