<?xml version="1.0" encoding="UTF-8"?>        <rss version="2.0"
             xmlns:atom="http://www.w3.org/2005/Atom"
             xmlns:dc="http://purl.org/dc/elements/1.1/"
             xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
             xmlns:admin="http://webns.net/mvcb/"
             xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
             xmlns:content="http://purl.org/rss/1.0/modules/content/">
        <channel>
            <title>
									FlexBOSS21 - EG4 Community Forum				            </title>
            <link>https://forum.eg4electronics.com/community/flexboss21/</link>
            <description>EG4 Community Forum Discussion Board</description>
            <language>en-US</language>
            <lastBuildDate>Wed, 06 May 2026 20:19:03 +0000</lastBuildDate>
            <generator>wpForo</generator>
            <ttl>60</ttl>
							                    <item>
                        <title>EG4_FAAB-2727 (Most Recent Firmware)</title>
                        <link>https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2727-most-recent-firmware/</link>
                        <pubDate>Mon, 06 Apr 2026 21:51:44 +0000</pubDate>
                        <description><![CDATA[EG4_FAAB-2727
2026-03-29

Based on FAAB-2626/2525.
Match LCD V25.
1. Improved. New England Grid Profile — added regional grid profile support for New England configurations, with Voltag...]]></description>
                        <content:encoded><![CDATA[<h3 data-v-2d096cc4="">EG4_FAAB-2727</h3>
<h5 class="title" data-v-2d096cc4="">2026-03-29</h5>
<ul class="list" data-v-2d096cc4="">
<li data-v-2d096cc4=""><span data-v-2d096cc4="">Based on FAAB-2626/2525.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">Match LCD V25.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">1. Improved. New England Grid Profile — added regional grid profile support for New England configurations, with Voltage-Active mode disabled by default.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">2. Improved. Added RS485 BUS communication support on the Meter485 port for PPL Electric installations.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">3. Improved. LUMA Grid Profile: Voltage-Active Power mode enabled by default.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">4. Improved. HECO Grid Profile: Frequency-Active Power mode enabled by default; under-excited reactive power set as default.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">5. Improved. Optimized charging power limitations when PV power is unbalanced across inverters in a parallel system.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">6. Improved. LCD phase setting labels updated from R/S/T to A/B, B/C, C/A （LCD V25）.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">7. Improved. Update fan logic to start fans at a lower temperature to optimize heat dissipation.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">8. Bug Fixes. Fixed repeated switching between on-grid and off-grid modes on the secondary inverter triggered by off-grid cut-off voltage in parallel shared-battery and lead-acid battery mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">9. Bug Fixes. Reduced probability of repeated state switching between PVBatGridOn and PVChgGridOn.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">10. Bug Fixes. Fixed the inability to exit on-grid AC couple charging state and switch to battery discharge when load exceeds AC couple power in a parallel system.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/flexboss21/">FlexBOSS21</category>                        <dc:creator>EG4 Eric</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2727-most-recent-firmware/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-2122 / 06-22-2025</title>
                        <link>https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2122-06-22-2025-3/</link>
                        <pubDate>Wed, 14 Jan 2026 15:46:21 +0000</pubDate>
                        <description><![CDATA[EG4_FAAB-2122
2025-06-22

Based on FAAB-2021
1.Add Weekly Setting function.
2.Add the function of Sporadic AC charge power function, it will cause the AC charge power to fluctuate rando...]]></description>
                        <content:encoded><![CDATA[<h3 data-v-2d096cc4="">EG4_FAAB-2122</h3>
<h5 class="title" data-v-2d096cc4="">2025-06-22</h5>
<ul class="list" data-v-2d096cc4="">
<li data-v-2d096cc4=""><span data-v-2d096cc4="">Based on FAAB-2021</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">1.Add Weekly Setting function.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">2.Add the function of Sporadic AC charge power function, it will cause the AC charge power to fluctuate randomly between the set AC charging power and 2% rated power.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">3.Optimize the response speed and stability in zero export mode in meter mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">4.Optimize the restart logic that modify the CT/meter, battery type and brand will not be restarted.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">5.Improve the issue of reading the RGM settings.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">6.Improve the issue of power display on Micro-Grid mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">7.Improve the issue of not stopping at the Stop Discharge Volt of forced discharge.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">8.Improve the issue where the LCD display on the load power side lacked Smart Load power when the Micro Grid plus Smart Load mode were enabled.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">9.Improve the issue of increased charge power when setting the Charge Last mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">10.Improve the issue of abnormal load display in web page flow chart during parallel mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">11.Improve the issue of getting phase lost warning when switching from on-grid and off-grid in three phase parallel mode.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/flexboss21/">FlexBOSS21</category>                        <dc:creator>EG4 Eric</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2122-06-22-2025-3/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-2122 / 06-22-2025</title>
                        <link>https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2122-06-22-2025-2/</link>
                        <pubDate>Wed, 14 Jan 2026 15:46:04 +0000</pubDate>
                        <description><![CDATA[EG4_FAAB-2122
2025-06-22

Based on FAAB-2021
1.Add Weekly Setting function.
2.Add the function of Sporadic AC charge power function, it will cause the AC charge power to fluctuate rando...]]></description>
                        <content:encoded><![CDATA[<h3 data-v-2d096cc4="">EG4_FAAB-2122</h3>
<h5 class="title" data-v-2d096cc4="">2025-06-22</h5>
<ul class="list" data-v-2d096cc4="">
<li data-v-2d096cc4=""><span data-v-2d096cc4="">Based on FAAB-2021</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">1.Add Weekly Setting function.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">2.Add the function of Sporadic AC charge power function, it will cause the AC charge power to fluctuate randomly between the set AC charging power and 2% rated power.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">3.Optimize the response speed and stability in zero export mode in meter mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">4.Optimize the restart logic that modify the CT/meter, battery type and brand will not be restarted.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">5.Improve the issue of reading the RGM settings.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">6.Improve the issue of power display on Micro-Grid mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">7.Improve the issue of not stopping at the Stop Discharge Volt of forced discharge.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">8.Improve the issue where the LCD display on the load power side lacked Smart Load power when the Micro Grid plus Smart Load mode were enabled.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">9.Improve the issue of increased charge power when setting the Charge Last mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">10.Improve the issue of abnormal load display in web page flow chart during parallel mode.</span></li>
<li data-v-2d096cc4=""><span data-v-2d096cc4="">11.Improve the issue of getting phase lost warning when switching from on-grid and off-grid in three phase parallel mode.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/flexboss21/">FlexBOSS21</category>                        <dc:creator>EG4 Eric</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2122-06-22-2025-2/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-2525</title>
                        <link>https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2525/</link>
                        <pubDate>Fri, 12 Dec 2025 17:32:25 +0000</pubDate>
                        <description><![CDATA[EG4_FAAB-2525
2025-09-28
Firmware Changelog – FAAB-2525 （Based on FAAB-2122）1.Added support for BASCO battery protocol （Battery Brand Setting 22）.2.Added support for SunSpec Modbus IEEE-15...]]></description>
                        <content:encoded><![CDATA[<h3 data-v-2d096cc4="">EG4_FAAB-2525</h3>
<h5 class="title" data-v-2d096cc4="">2025-09-28</h5>
<span data-v-2d096cc4=""><strong>Firmware Changelog – FAAB-2525</strong> （Based on FAAB-2122）</span><br /><span data-v-2d096cc4="">1.Added support for BASCO battery protocol （Battery Brand Setting 22）.</span><br /><span data-v-2d096cc4="">2.Added support for SunSpec Modbus IEEE-1547 certification.</span><br /><span data-v-2d096cc4="">3.Added support for N-PE bonding setting – enables closing the N-PE relay only in off-grid mode.</span><br /><span data-v-2d096cc4="">4.Added support for displaying EG4 battery model information.</span><br /><span data-v-2d096cc4="">5.Improved download time for subsequent firmware updates.</span><br /><span data-v-2d096cc4="">6.Enhanced encryption for firmware update packages.</span><br /><span data-v-2d096cc4="">7.Improved stability of remote LCD firmware updates.</span><br /><span data-v-2d096cc4="">8.Added ability to configure generator exercise cycles even when grid power is available （keeps generator in idle operation）.</span><br /><span data-v-2d096cc4="">9.Improved MPPT behavior.</span><br /><span data-v-2d096cc4="">10.Adjusted the Absorb Voltage and Float Voltage lower limit from 50 V → 48 V.</span><br /><span data-v-2d096cc4="">11.Expanded the setting range of Stop AC Charge SOC （%） to 0–101%.</span><br /><span data-v-2d096cc4="">12.Expanded the configurable range of grid protection parameters for 127/220 V grid type.</span><br /><span data-v-2d096cc4="">13.Fixed issue where LCD communication fault could occur when the FlexBOSS LCD screen kit backlight was off.</span><br /><span data-v-2d096cc4="">14.Improved LCD display for PV input arrow:</span><br /><span data-v-2d096cc4="">- Single unit: arrow displays when PV power &gt;100 W</span><br /><span data-v-2d096cc4="">- Parallel system: arrow displays when total PV power &gt;300 W</span><br /><span data-v-2d096cc4="">15.Fixed issue where consumption power was not displayed on monitoring line chart during off-grid or parallel operation.</span><br /><span data-v-2d096cc4="">16.Improved stability when switching between on-grid and off-grid modes if the battery discharges to the On-Grid Cut-Off SOC/Voltage while running with GridBOSS and set to Off-Grid mode.</span><br /><span data-v-2d096cc4="">17.Improved SOC control mode:</span><br /><span data-v-2d096cc4="">- If battery voltage drops below the off-grid cut-off voltage, the inverter will force charge the battery up to （cut-off voltage + 2 V）.</span><br /><span data-v-2d096cc4="">- Prevents over-discharge in cases where BMS SOC reporting is inaccurate.</span><br /><span data-v-2d096cc4="">18.When inverter is set to lead-acid battery mode or no battery mode, the active W04: Battery BMS Status Alarm will now be cleared automatically.</span>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/flexboss21/">FlexBOSS21</category>                        <dc:creator>EG4 Eric</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2525/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-2021</title>
                        <link>https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2021-3/</link>
                        <pubDate>Wed, 12 Mar 2025 20:10:27 +0000</pubDate>
                        <description><![CDATA[2025-03-11
Same as fAAB-2021, change based on FAAB-1E1E.

1. Add the new startup option &quot;Soc/Volt + Time&quot; for AC charge startup. （Compatible with LCD V20）.
2. Add two-time settings to th...]]></description>
                        <content:encoded><![CDATA[<h5 class="title" data-v-8ce5ee12="">2025-03-11</h5>
<span data-v-8ce5ee12="">Same as fAAB-2021, change based on FAAB-1E1E.</span><br />
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Add the new startup option "Soc/Volt + Time" for AC charge startup. （Compatible with LCD V20）.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2. Add two-time settings to the generator startup setting.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3. Add AC couple on EPS port function to Flex Boss that paralleled with Grid Boss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4. Optimize when either ‘charge control’ or ‘discharge control’ setting changes, the settings for both will be updated synchronously.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">* synchronized Charge and Discharge. if a customer sets the charging control to SOC, the discharging control setting will automatically switch to SOC.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5. Changing the CT ratio on monitor site no longer requires a system restart.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6. Optimize the issues of flicker.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7. Optimize the standard voltage of BUS1 to 370V.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8. Optimize the communication fault logic when connecting to Grid Boss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">*it has been modified to alert when disconnecting the communication line when on-grid or off-grid</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9. Optimize the issue of switching and EPS output interruption when PV is weak</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10. Optimize DCDC operation to make it more stable.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11. Fix the parallel phase error issue when connecting generator in split phase parallel system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">LCD V20</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1. Add the new startup option "Soc/Volt + Time" for AC charge startup.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/flexboss21/">FlexBOSS21</category>                        <dc:creator>Jared</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/flexboss21/eg4_faab-2021-3/</guid>
                    </item>
				                    <item>
                        <title>EG4_FAAB-1E1E</title>
                        <link>https://forum.eg4electronics.com/community/flexboss21/eg4_faab-1e1e-2/</link>
                        <pubDate>Wed, 20 Nov 2024 20:32:14 +0000</pubDate>
                        <description><![CDATA[2024-11-13

Same as fAAB-1E1E, changes based on the FAAB-1B1C and FAAB-1D1D. After updating, it cannot restore version of FAAB-1C1C and below.
1.Compatible with FlexBoss.
2.Support worki...]]></description>
                        <content:encoded><![CDATA[<h5 class="title" data-v-8ce5ee12="">2024-11-13</h5>
<ul class="list" data-v-8ce5ee12="">
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">Same as fAAB-1E1E, changes based on the FAAB-1B1C and FAAB-1D1D. After updating, it cannot restore version of FAAB-1C1C and below.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">1.Compatible with FlexBoss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">2.Support working with GridBoss.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">3.Add Dark Start logic to disconnect the EPS load</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">by using the dry contact 2 to control external relay or contactor</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12=""> when the battery SOC/Volt is very low and there is no grid available and allows the connected grid-tied inverter or generator to prioritize charging the battery to dart start the system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">4.Add WattNode RGM protocol, CT ratio and direction setting.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">5.Add Dry contact reuse function for configuring RSD, Smart load, Darkstart and Non-critical Load.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">6.Optimize the ability to take the half wave load.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">7.Optimize remote update process.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">8.Optimize the protection of model settings.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">9.Optimize the update process without power loss for the single, parallel, GridBoss parallel system. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">10.Optimize the charge and discharge current setting limit for parallel system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">11.Optimize the BUS1 issue when the battery voltage goes to 40V. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">12.Optimize the operation of non-shared battery mode for GridBoss parallel system.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">13.Optimize generator dry contact logic in parallel system. The master unit summarizes the status of each dry contact. If any dry contact meets the ON conditions, the system is set to work. If all unit meet the OFF conditions, the system will be set to stop. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">14.Optimize the Lithium battery option 31 not being able to be set for 16 cell lithium battery without communication. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">15.Optimize the issue that AC charge power cannot be reduced to 0 when the load exceeds the set generator rating power in parallel system with generator. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">16.Optimize the frequency shift when AC couple power exceeding system requirements in single unit with GridBoss system. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">17.Optimize the logic of Grid Always On function in smart load setting that,</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">keep the smart load working even if enable Off-Grid Mode as long as the grid exists.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">18.Optimize the LCD power flow display of the parallel system to display the total system power and change the display of power unit from W to kW.</span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">19.Optimize display of PV3 power on LCD. </span></li>
<li data-v-8ce5ee12=""><span data-v-8ce5ee12="">20.Optimize the display of three-phase load power in parallel system.</span></li>
</ul>]]></content:encoded>
						                            <category domain="https://forum.eg4electronics.com/community/flexboss21/">FlexBOSS21</category>                        <dc:creator>Jared</dc:creator>
                        <guid isPermaLink="true">https://forum.eg4electronics.com/community/flexboss21/eg4_faab-1e1e-2/</guid>
                    </item>
							        </channel>
        </rss>
		