Parts are on the way for my Hybrid system which will include a:

Flexboss21.

Gridboss.

(3) EG4 14.34kWh battery.

(48) 440W solar modules.

I'm entering this system for any questions and advice that may apply.  I have a contractor for the installation.  We are on a fast track to have it all operational prior to December 31st in order to qualify for the Federal tax credit.  Oregon also has an incentive program that provides a $4,250 incentive for the project.  This is the time to go for it!



   
EG4 Eric reacted
Quote
(@gottheknack)
Active Member
Joined: 4 months ago
Posts: 7
Topic starter  

I order to qualify for the Federal 30% tax credit, we needed to have my system operational by the end of 2025.  I'm happy to report that, thanks to my electrical contractors and a lot of work and assistance on my part, we got the inspection sign-off at around 2PM on December 31st.  It was then powered up on self-consumption mode shortly thereafter..  High Fives amongst all!

We had to cut scope a bit due to one panel damaged in shipping and some racking connects that did not arrive.  I also did not install two smart ports in order to save a few hours. 

Now that all of the the materials are finally here, including the replacement solar panel, we can finish up perhaps this week.

My bi-directional utility meter install is still a few weeks out,  At this time of the year, I won't miss it much.



   