Parts are on the way for my Hybrid system which will include a:
Flexboss21.
Gridboss.
(3) EG4 14.34kWh battery.
(48) 440W solar modules.
I'm entering this system for any questions and advice that may apply. I have a contractor for the installation. We are on a fast track to have it all operational prior to December 31st in order to qualify for the Federal tax credit. Oregon also has an incentive program that provides a $4,250 incentive for the project. This is the time to go for it!
I order to qualify for the Federal 30% tax credit, we needed to have my system operational by the end of 2025. I'm happy to report that, thanks to my electrical contractors and a lot of work and assistance on my part, we got the inspection sign-off at around 2PM on December 31st. It was then powered up on self-consumption mode shortly thereafter.. High Fives amongst all!
We had to cut scope a bit due to one panel damaged in shipping and some racking connects that did not arrive. I also did not install two smart ports in order to save a few hours.
Now that all of the the materials are finally here, including the replacement solar panel, we can finish up perhaps this week.
My bi-directional utility meter install is still a few weeks out, At this time of the year, I won't miss it much.