What have you figured out? Did you get it working? And running your V1’s in lead acid mode is fine they are just trying to diagnose the problem
I’m not sure about replacing it with a 100 amp breaker but it could always be ran through a separate breaker box that has a 100 amp breaker
Thanks I had missed that setting. I tried it but it didn’t help much. It’s a simple software issue if we could get the attention of the EG4 folks.
@pawnee I was browsing the 18K manual and came across this: regarding seamless switch. Didn't find much info on it, maybe the folks at SS could e...
@ericw Yes! Setting 15 is "AC first" which is the times you want the grid to power the loads.
Looks excellent! Great work. JB
@dougl as of now, the BA dongles don't have the capability to be updated. Feel free to send me a DM and I can look into getting one for you.
Hello Jared, If you don't mind, can you share what you have set for the Float charge and Bulk charge?
@joel-brodeur Thanks
@Pawnee You may want to look over the following thread: 6000XP generator transfer after charging – Page 2 – General Troubleshooting – EG4 Community F...
Seems like so many issues using the Inverter generator connection, I just use the chargeverter. No issues and charges on voltage so balances out SOC
@joel-brodeur I'm thinking that is the best solution. Drop the grid/pv and drain to 20% once a month, but would like to have confirmed by EG4. We ha...
I have the same situation and have 100 amp service.