... if you are shopping for a transfer switch, spend the extra money and buy the GE model. The cheaper Amazon models you will find are not UL listed a...
No. My system is a whole-house backup configuration. Main disconnect and transfer switch are before the 18Kpv. Main dist panel is after the 18K. G-N b...
The 18Kpv does NOT pass through unless the inverter is running. The default state for the pass through relays is open, not closed. The inverter softwa...
@lyrawinslow Yes, of course. It's a small generator so it can't charge as fast. I limit it to 1600 watts in the Chargeverter settings - 80% of the ...
I use a small 2000W 120VAC portable generator for exactly the scenario you have in mind - I use it to charge the battery bank and nothing else. In my ...
@eg4eric Hi Eric, Can you explain this statement? Are you saying that for those of us that have a battery backup system (no PV), that there's a ...
@zali I don't have a GB, so can't help you there.
Read the thread. It sounds like the vendor has installed several test SW iterations into his system during the troubleshooting process, and the latest...
Probably related to this issue. It sounds like there is a software fix, perhaps not released in an official build yet...
I believe you already have a Victron smart shunt on your system connected to the Cerbo. With FLA batteries, that's already the best solution you have ...
@coolrunnings ...can't edit my previous post. I just saw your other post about the Cerbo... So without a BMS input, I'm curious how the 18K deter...
@coolrunnings Cool. I would trust everything you listed except the EG4 screen. My system, consisting of one 18Kpv and six LL-S rack units, can cons...
@jwmarshall Are you saying that Signature Solar is replacing ten 18Kpv units because of a parallel phase error that only started after a firmware u...
@coolrunnings Thanks for sharing the solution here. Keep in mind the batteries won't register any current unless it is above some shunt measureme...