RE: EG4 units needed for 28KV application in Florida

You need to calculate your AC power needs. If your water heat is on AC power and your AirCon is on AC power, that is a pretty sizable load. IF your ...

6 days ago
Forum
Reply
RE: Simple generator wiring confirmation

I wired my 18kPV to my Honeywell generator. I had to buy a Generac two-wire start modification kit from Generac/honeywell and then run two wires to t...

6 days ago
Reply
RE: Not Impressed

My system is slightly different (18kPV inverter), but I have the same wall mount batteries. I chose to install them on the wall close to the concrete...