How do I connect multiple EG4 chargeverters to each other (master and slave relationship) to concurrently use them in parallel, and then connect to my generator to manage generator start/stop?
This is not a typical setup, and we recommend using two separate generators. The Chargeverter was not designed to be configured in a master-slave configuration.