@eric There is enough production to power both the load and the batteries. I've noticed the Enphase app is always exporting about 10% (see image) of ...
@ron I'm sorry, could you provide more detail on what you're referring to?
@jared I will absolutely check that as soon as I have time to log in but I'm not sure it will be helpful as the problem is not the time the problem is...
Also, just to add. Apparently if I set "Grid Sell Back" to disable, the connection to my enphase combiner gets lost and I start to import from the gri...
Is your system producing enough solar to power loads and charge batteries?For the Battery Priority Start Time 1, try setting to 00:01. If this still d...
@chris07x Yes, The reply from @eric (below) (I am replying before his reply) is a good answer. But it does not help my understanding. Here's ...
You can use the app or the monitoring website (Maintenance Tab) to update your inverter to the most recent firmware. Version 20 of the LCD firmware is...
@eric Hi Eric, thanks for the reply. These are my current settings. See attached image. Any suggestions to prioritize battery charge would be greatl...
Is it showing any warning or Fault codes on the screen or is the screen staying the same as the screenshot then just turns off?
@chris07x The Power Backup feature controls the seamless transition of the inverter to battery power when the grid fails or is interrupted. Enab...
We are still conducting internal testing. Version 0405 remains the current standard release.
@george-redinger Hey George,Question about your mention of having to enable battery backup mode. I saw that you have "Seamless EPS switching enabled"...
@eareyes20 Can you share your inverter's serial number or station name so we can look into this issue for you?
@decker make sure to check the station time, end-user time, and the time on the settings are all the same. If they are not the same the time will inve...