[Closed] EG4_FAAB-2021

1 Posts
1 Users
0 Reactions
39 Views
Jared
(@jared)
Posts: 252
Online Support Admin
Topic starter
 
2025-03-11

Same as fAAB-2021, change based on FAAB-1E1E.

  • 1. Add the new startup option "Soc/Volt + Time" for AC charge startup. (Compatible with LCD V20).
  • 2. Add two-time settings to the generator startup setting.
  • 3. Add AC couple on EPS port function to Flex Boss that paralleled with Grid Boss.
  • 4. Optimize when either ‘charge control’ or ‘discharge control’ setting changes, the settings for both will be updated synchronously.
  • * synchronized Charge and Discharge. if a customer sets the charging control to SOC, the discharging control setting will automatically switch to SOC.
  • 5. Changing the CT ratio on monitor site no longer requires a system restart.
  • 6. Optimize the issues of flicker.
  • 7. Optimize the standard voltage of BUS1 to 370V.
  • 8. Optimize the communication fault logic when connecting to Grid Boss.
  • *it has been modified to alert when disconnecting the communication line when on-grid or off-grid
  • 9. Optimize the issue of switching and EPS output interruption when PV is weak
  • 10. Optimize DCDC operation to make it more stable.
  • 11. Fix the parallel phase error issue when connecting generator in split phase parallel system.
  • LCD V20
  • 1. Add the new startup option "Soc/Volt + Time" for AC charge startup.
 
Posted : March 12, 2025 8:10 pm