You would need to go to the working mode tab in the settings and set the Micro-Grid parameters
The MPPT requires more than 100V of PV input to begin operating and generating wattage. Whether 3.2kW is enough power to support your loads and charge...
@robstange Got it! If you need a replacement dongle or would like assistance getting it connected, feel free to let me know. I’d be happy to walk you ...
@krzysiek_kta Thank you for the feedback and yes, I can definitely share this with our team!
I apologize, ignore my last post. You only need 1 cable, which is the one that the adapter comes with. You can try removing one file, but you should b...
Are you using the correct cables for each update?
I've attached a few helpful links that explain this in more detail. It’s recommended to maintain an 80% Depth of Discharge (DoD), regularly dischargin...
@powerup Yes, that should work as well.
Yes, the wiring diagram you provided should work.
@ray I'm putting in a request today for a replacement dongle. So, we will get it shipped out as soon as possible.
@robstange I apologize for the delayed response. I can send you a replacement dongle if you haven’t already received one from your distributor.
When there is not enough solar, the mini split will attempt to come out of sleep mode 3 times. If all three attempts fail, the unit will not try again...
@krzysiek_kta This is currently not possible.
@krzysiek_kta If the issue occurs again after switching back to Lithium 1, please send me your inverter's serial number so we can investigate further ...
Ensure that Battery Backup Mode is disabled, verify that you have sufficient solar and battery capacity to support your loads, and set the On-Grid Cut...